Site, load and connection assessment
Review usable roof or land area, shading, electricity bills and load profile, site access and the proposed grid connection. Structural and ground conditions determine which mounting solution can be considered.
OAKEN / SOLAR ENGINEERING
From understanding your needs to design and equipment selection. A clear path for your solar project.

EXPLORE THE CENTER
Explore your application, build a layout and prepare for engineering review.
Villa, apartment, agriculture or power plant: find your starting point.
Open workspace ↗Site dimensions, neon layout, panels and inverters with capacity checks.
Open workspace ↗Strings, grid, structures, protection and handover documentation.
Open workspace ↗Eight equipment families, live catalogue and compatibility guidance.
Open workspace ↗Searchable glossary, preliminary calculations and technical references.
Open workspace ↗Readiness checklist, delivery stages and a technical enquiry.
Open workspace ↗OAKEN-branded products: request changes for technical review and a tailored proposal.
Open workspace ↗OAKEN / EPC STUDIO
Choose equipment. Check the details. Request a proposal.
Conceptual pre-design. Structure, shading, cabling and safety require site engineering.
The light path illustrates energy flow only, not wiring or generation simulation.
Products are offered under the OAKEN brand. Share your project requirements to review customization, specifications, quantity and delivery with our team.
ENGINEERING / PROCUREMENT / CONSTRUCTION
Review usable roof or land area, shading, electricity bills and load profile, site access and the proposed grid connection. Structural and ground conditions determine which mounting solution can be considered.
Define the array layout, string configuration, DC/AC sizing and inverter selection. Check temperature-adjusted string voltage, current limits and the MPPT operating range against the selected equipment datasheets.
Estimate annual generation using location, orientation, shading and system losses. Installed power in kWp is not the same as energy production in kWh. If storage is included, size it for usable energy, load power and required backup duration.
Specify the single-line diagram, cable sizing, voltage-drop assumptions, isolation, earthing and protection coordination. Grid-interface settings and monitoring requirements must follow the project conditions and applicable utility requirements.
Prepare a bill of materials with model references, quantities and approved technical specifications. Confirm availability, warranty documents, delivery milestones and responsibility for shipping, inspection and any substitutions before ordering.
Agree the installation plan, inspection records and commissioning procedure. Handover can include as-built drawings, test results, equipment records, operating instructions and training, according to the contract.
Contact OAKEN
Send the product model, quantity, project location and delivery requirements. For solar EPC, include the site type and target capacity if known.